Fiveable

🪚Public Policy Analysis Unit 10 Review

QR code for Public Policy Analysis practice questions

10.4 Sensitivity Analysis and Risk Assessment

10.4 Sensitivity Analysis and Risk Assessment

Written by the Fiveable Content Team • Last updated August 2025
Written by the Fiveable Content Team • Last updated August 2025
🪚Public Policy Analysis
Unit & Topic Study Guides

Cost-benefit analysis isn't always clear-cut. Sensitivity analysis and risk assessment help us understand how changes in key variables might affect our results. By tweaking inputs and running different scenarios, we can get a better grip on the uncertainties.

These techniques give us a range of possible outcomes instead of just one answer. They help decision-makers understand potential risks and rewards, making it easier to choose the best course of action in an uncertain world.

Sensitivity and Scenario Analysis

Evaluating Uncertainty in Cost-Benefit Analysis

  • Sensitivity analysis systematically changes variables in a model to determine the effects of such changes and identify the most sensitive variables
  • Involves changing one variable at a time while holding others constant to see how sensitive the outcome is to each variable (discount rate, costs, benefits)
  • Scenario analysis creates different scenarios by changing multiple variables simultaneously to assess their combined impact on the project's net present value or other outcome measures
  • Considers best-case, worst-case, and most likely scenarios to provide a range of possible outcomes and help decision-makers understand potential risks and rewards (optimistic, pessimistic, baseline scenarios)
Evaluating Uncertainty in Cost-Benefit Analysis, Making Sense of Uncertainty: Nonprofit Scenario Planning During a Crisis | Bridgespan

Break-Even Analysis and Uncertainty

  • Break-even analysis determines the point at which total costs equal total benefits, indicating the minimum level of benefits needed for the project to be worthwhile
  • Calculates the break-even point by setting net present value to zero and solving for the unknown variable, such as the minimum number of users for a public service
  • Uncertainty refers to the lack of precise knowledge about the values of costs and benefits in a cost-benefit analysis
  • Arises from incomplete information, measurement errors, and the inherent variability of key parameters (discount rates, project lifespan, externalities)
  • Sensitivity analysis, scenario analysis, and break-even analysis help address uncertainty by exploring how changes in assumptions affect the results and inform decision-making under uncertainty
Evaluating Uncertainty in Cost-Benefit Analysis, Risk assessment template - tools4dev

Risk Assessment Techniques

Quantifying Risk through Monte Carlo Simulation

  • Risk assessment involves identifying, analyzing, and evaluating potential risks that could impact the costs, benefits, or overall success of a project or policy
  • Monte Carlo simulation is a computerized mathematical technique that accounts for risk in quantitative analysis and decision-making
  • Involves defining a range of possible values for uncertain variables and randomly sampling from those ranges to generate a large number of scenarios (thousands of iterations)
  • Produces a probability distribution of potential outcomes, allowing analysts to quantify the likelihood of different results and identify key sources of risk (normal distribution, skewed distribution)

Expected Value and Probability Distributions

  • Probability distribution shows the likelihood of different values occurring for an uncertain variable, based on historical data, expert judgment, or statistical analysis
  • Common probability distributions include normal (bell-shaped curve), uniform (equal probability for all values), and triangular (minimum, most likely, maximum values)
  • Expected value is the sum of all possible values of a variable, weighted by their respective probabilities
  • Represents the average outcome over a large number of trials or scenarios, helping decision-makers compare and rank alternatives based on their expected costs and benefits
  • Combining Monte Carlo simulation with probability distributions provides a comprehensive risk assessment by generating a range of potential outcomes and their associated probabilities (5th percentile, 95th percentile)