Practice FRQ 1 of 121/12

1. A sealed cylinder contains n=0.500 moln = 0.500\ \text{mol}n=0.500 mol of a monatomic ideal gas and is fitted with a frictionless, movable piston of cross-sectional area A=4.00×10−3 m2A = 4.00× 10^{-3}\ \text{m}^2A=4.00×10−3 m2. The cylinder is initially in thermal equilibrium with a large reservoir at temperature T0=300 KT_0 = 300\ \text{K}T0​=300 K. The gas is initially at pressure P0=1.00×105 PaP_0 = 1.00× 10^5\ \text{Pa}P0​=1.00×105 Pa and volume V0V_0V0​. A schematic of the apparatus is shown in Figure 1.

Figure 1. Sealed cylinder with movable frictionless piston in thermal contact with an adjustable-temperature reservoir (initial state at T₀ and P₀).

Figure 1

Figure 2. Microscopic model of gas particles at state 0 (T₀) and state 1 (T₁) for comparing average speed and momentum transfer rate at the same volume.

Figure 2

Figure 3. Blank P–V diagram with states 0 and 1 at the same pressure P₀; students sketch the constant-pressure path from 0 to 1.

Figure 3
A.
i.

The reservoir temperature is increased so that the gas reaches a new equilibrium temperature T1=450 KT_1 = 450\ \text{K}T1​=450 K while the piston is free to move.

Complete the following tasks in Figure 2.

•

Indicate in Panel (b) whether the average speed of the particles is greater than, less than, or equal to that in Panel (a).

•

Indicate in Panel (b) whether the average rate of momentum transfer to the cylinder wall (and thus the pressure) is greater than, less than, or equal to that in Panel (a) at the same volume.

ii.

The gas is heated from T0T_0T0​ to T1T_1T1​ in a quasistatic process at constant pressure P0P_0P0​. Using Figure 3, sketch the process path from state 0 to state 1.

Derive an expression for the final volume V1V_1V1​ in terms of nnn, T1T_1T1​, and P0P_0P0​. Begin your derivation by writing a fundamental physics principle or an equation from the reference information.

Figure 4. Heat transfer through a metal plate of thickness L between a hot reservoir and the gas; plate area equals the cylinder cross-sectional area.

Figure 4
B.

Indicate whether the change in entropy of the gas is positive, negative, or zero. The gas undergoes the constant-pressure process from state 0 to state 1, where the final temperature is T1=450 KT_1 = 450\ \text{K}T1​=450 K and the pressure remains P0=1.00×105 PaP_0 = 1.00× 10^5\ \text{Pa}P0​=1.00×105 Pa. The amount of gas is n=0.500 moln = 0.500\ \text{mol}n=0.500 mol, and the gas is monatomic and ideal. Assume the process is quasistatic and that no phase changes occur. The heat transfer mechanism is shown in Figure 4.

Positive
Negative
Zero

Justify your answer.

Timed

00:00

Response auto-saves






Pep

essential ap study content awaits..

Features
Testimonials
Testimonials
start studying →
FRQ Directions
Free Response Question Practice

This practice environment simulates the AP AP Physics 2 Free Response Questions section. Here are some guidelines:

  • Read each question carefully before responding. Pay attention to command verbs like "identify," "explain," "analyze," or "evaluate."
  • Use the timer to practice time management. You can pause, restart, or hide the timer as needed.
  • Mark for Review if you want to come back to a question later.
  • Your responses are saved automatically as you type. You can also use the drawing tool for questions that require diagrams or graphs.
  • Use the toolbar for formatting options like bold, italic, subscript, and superscript.
  • Navigate between questions using the Previous and Next buttons at the bottom of the screen.

Tip: Answer all parts of each question. Partial credit is often available, so even if you are unsure, provide what you know.