Ethereum's architecture is a complex system of interconnected components. At its core, the Ethereum Virtual Machine (EVM) executes smart contracts, while accounts, state management, and gas fees work together to create a secure, decentralized platform.

The EVM provides a runtime environment for smart contracts, ensuring deterministic execution across the network. Ethereum's dual account system, gas mechanism, and client software form the backbone of this revolutionary blockchain platform, enabling the creation of decentralized applications.

Ethereum Platform Architecture

Components of Ethereum architecture

  • Ethereum Virtual Machine (EVM)
    • Decentralized, Turing-complete virtual machine executes smart contracts
    • Ensures deterministic execution across all nodes participating in the network
    • Maintains security and integrity of the Ethereum blockchain
  • Ethereum accounts
    • Externally Owned Accounts (EOAs)
      • Controlled by private keys held by users initiating transactions
      • Interact with smart contracts deployed on the Ethereum network
    • Contract Accounts
      • Controlled by the code stored within them defining their behavior
      • Activated when receiving transactions from EOAs or other contracts
  • Ethereum state
    • Represents the current state of the Ethereum blockchain at a given point in time
    • Includes account balances, contract storage, and deployed contract code
    • Updated with each transaction processed on the network
  • Gas and transaction fees
    • Mechanism to prevent infinite loops and resource exhaustion on the network
    • Users pay gas fees in Ether for computational resources consumed by their transactions
    • Incentivizes miners to include transactions in blocks they propose
  • Ethereum clients and nodes
    • Software implementations of the Ethereum protocol (Geth, Parity)
    • Maintain a local copy of the blockchain and participate in consensus
    • Validate transactions and blocks, propagating them across the network
Components of Ethereum architecture, blockchain - Ethereum block architecture - Ethereum Stack Exchange

Role of Ethereum Virtual Machine

  • Provides a runtime environment for smart contracts deployed on Ethereum
  • Executes bytecode compiled from high-level programming languages (Solidity, Vyper)
  • Ensures deterministic execution of smart contracts across all nodes in the network
  • Maintains a stack-based architecture with a limited instruction set for security
  • Prevents access to external resources to maintain determinism and reproducibility
  • Charges gas for each computational step to prevent infinite loops and resource exhaustion
  • Enables the creation of decentralized applications (DApps) on the Ethereum platform
Components of Ethereum architecture, Frontiers | T-EDGE: Temporal WEighted MultiDiGraph Embedding for Ethereum Transaction Network ...

EOAs vs contract accounts

  • Externally Owned Accounts (EOAs)
    • Controlled by private keys held by users initiating transactions
    • Can initiate transactions and interact with smart contracts deployed on Ethereum
    • Have an Ether balance but no associated code defining their behavior
    • Represent user accounts on the Ethereum network
  • Contract Accounts
    • Controlled by the code stored within them defining their behavior and state
    • Cannot initiate transactions on their own, only activated by incoming transactions
    • Have an Ether balance and associated code (smart contract) governing their actions
    • Can execute complex logic and interact with other contracts on the network
    • Enable the creation of decentralized applications (DApps) and autonomous entities

Gas in Ethereum ecosystem

  • Unit that measures the computational effort required to execute operations on Ethereum
  • Each operation in the EVM has an associated gas cost based on its complexity
  • Gas costs are determined by the resource consumption of the operation (storage, computation)
  • Users specify a gas limit and gas price when submitting transactions to the network
    1. Gas limit: Maximum amount of gas the user is willing to consume for the transaction
    2. Gas price: Amount of Ether the user is willing to pay per unit of gas consumed
  • Transactions that exceed the gas limit or have insufficient gas will be reverted
  • Gas fees are paid in Ether and awarded to miners as an incentive for including transactions
  • Prevents infinite loops, resource exhaustion, and denial-of-service attacks on the network
  • Ensures fair allocation of network resources and prevents abuse by malicious actors
Pep mascot
Upgrade your Fiveable account to print any study guide

Download study guides as beautiful PDFs See example

Print or share PDFs with your students

Always prints our latest, updated content

Mark up and annotate as you study

Click below to go to billing portal → update your plan → choose Yearly→ and select "Fiveable Share Plan". Only pay the difference

Plan is open to all students, teachers, parents, etc
Pep mascot
Upgrade your Fiveable account to export vocabulary

Download study guides as beautiful PDFs See example

Print or share PDFs with your students

Always prints our latest, updated content

Mark up and annotate as you study

Plan is open to all students, teachers, parents, etc
report an error
description

screenshots help us find and fix the issue faster (optional)

add screenshot